Helping Maintain a Significant New Zealand Bridge Asset
In addition to the recent box girder strengthening design and contract management, Beca assists on a day-to-day basis in managing, assessing and maintaining the working life of the Auckland Harbour Bridge (AHB) through studies, reporting and design activities.
Between 1995 and 2000, Beca carried out the seismic upgrade for the structure. This project laid the foundation for Beca's long-term involvement and relationship with the NZ Transport Agency and the structure, and also gained significant accolades for excellence in the field of structural engineering when awarded the prestigious 2001 ACENZ Gold Medal.
Beca is now established as a first port-of-call for works relating to New Zealand's largest bridge asset. All clients can tap into our long-term asset management and structural rehabilitation experience attained through working with structures such as the AHB.